Did the final
completion meet the specification for the building? maybe the system design was too complicated in the first instance,
is the system generating hundreds of nuisance alarms. These types of issues can hang around, long after a building has been
handed over and occupied. Quite often it is not easy to understand the programming that was installed and tested, hence
even minor control or programming changes are difficult for building owners or managers to undertake. And when changes
are made, can they be sure that the changes have achieved the desired effect.
N PLUS 1 can
assess your controls set-up and help you understand the functionality of the system and assist with any changes required
to the controls system.